Quick answer: California SB 79 allows qualifying housing developments of at least five units near designated major transit stops to use statewide residential density, building-height, and floor-area standards. It does not automatically waive environmental review or grant a building permit. In the City of Los Angeles, local implementation ordinances may defer SB 79 for specific sites, so every project requires a parcel-level analysis. California HCD · Los Angeles City Planning
Last reviewed: November 1, 2026
A note on how this article is sourced. SB 79 is a state law that each city is allowed to implement in its own way, within limits set by the State Department of Housing and Community Development (HCD). Where state law and Los Angeles practice differ, this article says so. The City’s approach was adopted in June 2026 and is still being reviewed, so confirm your parcel’s status directly before relying on anything here.
What SB 79 is
SB 79 (Wiener), nicknamed the Abundant and Affordable Homes Near Transit Act, was signed on October 10, 2025 and took effect July 1, 2026. It is codified at Government Code sections 65912.155 through 65912.162.
In short, it sets a statewide minimum for how tall and dense housing can be near major transit stops. A qualifying project near a stop can build up to the heights, densities, and floor area ratios listed below, even if local zoning would otherwise allow less.
SB 79 is a different tool from SB 9. SB 9 provides a separate process for certain qualifying two-unit housing projects and urban lot splits on single-family parcels, subject to its own eligibility conditions. SB 79 is aimed at larger projects of five or more units near transit. It does not replace SB 9, and the two have different requirements.
SB 79 allows projects. It does not require any owner to build, sell, or redevelop.
How we got here
SB 79 is the third major attempt by Senator Scott Wiener to require denser housing near transit.
- SB 827 (2018): introduced in January 2018 and defeated in the Senate Transportation and Housing Committee in April 2018.
- SB 50 (2019–2020): a revised successor, defeated on the Senate floor in January 2020.
- SB 79 (2025): introduced in 2025 and signed by Governor Newsom on October 10, 2025. Its transit-oriented development standards began applying on July 1, 2026, subject to the statutory local-implementation and unincorporated-area rules.
Where it applies
Only in counties with enough rail
SB 79 applies in “urban transit counties,” which are counties that meet the statute’s threshold for the number of passenger rail stations. According to the Southern California Association of Governments (SCAG), Los Angeles County is currently the only urban transit county in its region. Orange County will qualify when the OC Streetcar opens.
Near a qualifying transit stop
A project must be within one-half mile of a qualifying “TOD stop” (transit-oriented development stop). Distance is measured in a straight line from the nearest edge of the project’s parcel to a pedestrian access point of the stop.
Stops are sorted into two tiers:
- Tier 1: heavy rail, or commuter rail with very high frequency (at least 72 trains a day in both directions).
- Tier 2: light rail, commuter rail with high frequency (at least 48 trains a day in both directions), or bus service that meets the state’s standards, such as qualifying bus rapid transit.
Planned stops can qualify in some cases. Each metropolitan planning organization maps the stops and zones for its region, and that map carries a rebuttable presumption of validity. For Los Angeles, SCAG’s Regional Council approved its mapping approach in July 2026. SCAG published an updated TOD stops, zones, and tiers map on October 29, 2026, adjusting pedestrian-access points for specified Metro stations and incorporating locally preferred alternative projects for certain planned corridors. SCAG update. HCD has also published advisory clarifications on the definitions.
In a residential, mixed-use, or commercial zone
The statute applies to a site “zoned for residential, mixed, or commercial development.” Los Angeles City Planning’s SB 79 fact sheet says this includes single-family, multifamily, commercial, and light manufacturing zones. Sites not zoned for residential use, such as heavy manufacturing, are not covered.
What a qualifying project can build
These are the minimum standards a city must allow. The figures come from the statute as summarized by the Metropolitan Transportation Commission and the Association of Bay Area Governments, and the heights match Los Angeles City Planning’s fact sheet.
| Stop type and distance | Height | Density (units per acre) | Residential floor area ratio |
|---|---|---|---|
| Tier 1, within 200 feet of the stop’s pedestrian access point | 95 ft | 160 | 4.5 |
| Tier 1, within ¼ mile | 75 ft | 120 | 3.5 |
| Tier 1, ¼ to ½ mile | 65 ft | 100 | 3.0 |
| Tier 2, within 200 feet | 85 ft | 140 | 4.0 |
| Tier 2, within ¼ mile | 65 ft | 100 | 3.0 |
| Tier 2, ¼ to ½ mile | 55 ft | 80 | 2.5 |
The statute states these limits in feet, not stories. How many floors fit under a height limit depends on floor-to-floor heights and design. The ¼-to-½-mile rows apply only in cities of at least 35,000 residents. Los Angeles is above that size. Smaller cities get only the 200-foot and ¼-mile zones.
The 200-foot “adjacent” row reflects the statute’s adjacency bonus: an additional 20 feet of height, 40 units per acre, and 1.0 of floor area ratio for projects immediately next to a stop, applied before any density bonus.
Projects can also use the State Density Bonus Law, with the SB 79 density as the starting point. Transit agencies that own land near a qualifying stop have separate authority under the statute to adopt minimum zoning standards for their own parcels, so agency-owned sites can follow different rules.
What a project must satisfy
Being near a station is not enough. A project must also meet these conditions:
- At least five dwelling units.
- A minimum density of 30 units per acre, or the local minimum if that is higher.
- An average unit size of no more than 1,750 net habitable square feet.
- No transient lodging. A hotel or similar use does not qualify.
- Affordable housing for projects of more than 10 units: a set-aside of 7% extremely low-income, 10% very low-income, or 13% lower-income units. Rentals must stay affordable for 55 years and ownership units for 45 years. A stricter local inclusionary requirement controls if there is one.
- Skilled and trained workforce and prevailing wage standards for any building over 85 feet tall.
- Limits on demolishing protected housing. The statute restricts demolition on sites where rent- or price-controlled housing was occupied by tenants within the past seven years, and local demolition and anti-displacement rules still apply. Los Angeles City Planning also describes tenant protections in its fact sheet, including relocation assistance, a right of first refusal for lower-income households, and a right to return at the prior rent if a project stalls.
- Airport compatibility and fire safety: projects must be consistent with applicable airport land use compatibility standards and objective statewide fire safety standards.
SB 79 is not a permit-free right
SB 79 does not by itself create ministerial approval or exempt a project from CEQA. A project that meets SB 79’s standards and the applicable objective local standards is treated as consistent with local plans for purposes of the Housing Accountability Act, which limits a city’s ability to deny it or reduce its density. A project that is otherwise eligible for the state’s SB 35 or SB 423 streamlining may use that path.
Starting January 1, 2027, a denial of a conforming project in a high-resource area is presumed to violate the Housing Accountability Act, with penalties, unless the city shows a health, life, or safety reason.
Combining SB 79 with the State Density Bonus Law
An SB 79 project can also use the State Density Bonus Law. The SB 79 density is the starting point, so the bonus is calculated on top of it. Los Angeles City Planning’s fact sheet adds that SB 79 can be combined with the City’s Citywide Housing Incentive Program.
Two limits matter:
- Concession thresholds. To qualify for additional concessions under SB 79’s density bonus provision, a project must reach a minimum density that depends on the stop and distance: 90 units per acre for Tier 1 within ¼ mile, 75 for Tier 1 from ¼ to ½ mile and for Tier 2 within ¼ mile, and 60 for Tier 2 from ¼ to ½ mile. The number of concessions depends on the deepest affordability provided: up to three for extremely low-income units, two for very low-income units, and one for low-income units.
- Height beyond SB 79. A local government is not required to grant additional height above SB 79’s limits, except for 100% affordable projects under Government Code section 65915(d)(2)(D).
Do not assume a bonus can exceed SB 79’s limits across the board. Run the SB 79 numbers and the density bonus numbers together before you price a project.
SB 79 density and floor-area calculations: a developer example
Illustrative example, not an entitlement determination. Consider a 10,000-square-foot parcel that is eligible for the Tier 1 zone within one-quarter mile (but outside the 200-foot adjacency category), in a city where that zone is operative. The table above indicates a 120 dwelling-unit-per-acre standard, 3.5 residential FAR, and 75-foot height.
- Parcel acres: 10,000 ÷ 43,560 ≈ 0.2296 acre.
- Density-based unit calculation: 0.2296 × 120 ≈ 27.55 units, before any applicable statutory rounding rule, density bonus, local implementation rule, or feasibility constraint.
- Residential FAR calculation: 10,000 × 3.5 = 35,000 square feet of theoretical residential floor area, subject to the law’s floor-area definitions and applicable exclusions.
- Design constraint: Neither calculation guarantees that 27 or 28 units will fit; access, setbacks and permissible objective standards, circulation, egress, construction assemblies, and structural requirements can govern the ultimate design.
A conceptual pro forma should therefore separate statutory capacity, architecturally achievable yield, and financially supportable yield. Treat the numbers above as arithmetic only, not a verified project authorization.
How density bonus stacking should actually be modeled
Government Code §65915 may support density bonuses, incentives, concessions, waivers, and parking relief when its requirements are satisfied. SB 79 establishes the density used as the starting point for applicable density-bonus calculations. For illustration only, if an otherwise qualifying development established a 120-unit-per-acre base and independently qualified for a 50% density bonus, the resulting mathematical density would be 180 units per acre before project-specific treatment of fractional units. This does not establish that the example development qualifies for a 50% bonus. Its affordability election, unit mix, statutory percentage, and legal entitlement must first be reviewed.
Most importantly, a density bonus in unit count is not a blanket right to extend the building above the SB 79 height standard. The SB 79 provision addresses additional height separately and includes a narrow statutory exception involving certain 100% affordable housing projects. Waivers and concessions require their own legal and factual analysis. Gov. Code §65912.157 · Gov. Code §65915
Affordable housing, labor and anti-displacement: underwriting implications
Affordable housing set-asides
For qualifying projects over 10 dwelling units, SB 79 generally provides alternative affordability pathways of 7% extremely low-income, 10% very low-income, or 13% lower-income housing, with qualifying local inclusionary provisions potentially controlling when more demanding. The appropriate path is not merely a rounding exercise: underwriting must account for applicable income definitions, rent or sale restrictions, inclusionary ordinances, and the 55-year rental / 45-year ownership affordability terms described in the statute. The particular SB 79 percentage rule does not apply to projects of 10 units or fewer, but other local requirements may.
Prevailing wage and workforce rules
The SB 79-specific labor provision addresses developments with a building over 85 feet in height. Avoid describing an 85-foot project as automatically covered under that particular height trigger. Separate labor obligations may be imposed through SB 423 streamlining, public funding, other statutes, or project conditions; the labor analysis must cover every applicable pathway rather than SB 79 alone.
Rent-controlled and tenant-occupied buildings
Existing tenancies may substantially change redevelopment feasibility. SB 79 contains anti-displacement restrictions with specified unit-count and seven-year lookback conditions. There is no universal statement that every tenant-occupied parcel or every property with one controlled unit is automatically ineligible. Examine the precise statutory predicates, local rent stabilization laws, replacement-housing obligations, relocation obligations, and any required notices with qualified land-use and landlord-tenant counsel before assuming demolition is possible.
SB 79 and SB 423: approvals, CEQA and LADBS plan check
SB 79 is a zoning and development-standards pathway, not a building permit. A property qualifying for SB 79 does not automatically qualify for an exemption from the California Environmental Quality Act (CEQA), and it does not receive ministerial approval solely because it is in a transit zone. Independently eligible projects may use the streamlined ministerial route established under Government Code §65913.4, as amended by SB 423, subject to its affordability, location, environmental, prevailing-wage, and other requirements.
In Los Angeles, distinguish planning/entitlement review from Los Angeles Department of Building and Safety (LADBS) construction plan check. Even where land-use approval is streamlined, construction documents must address the applicable California Building Code, Los Angeles amendments, fire access, accessibility, energy compliance, structural and seismic design, utility work, and permit conditions. A construction contractor does not issue zoning entitlements or replace the architect, structural engineer, land-use lawyer, or public agency.
Commercial-to-residential conversion, existing buildings and ADUs
Can SB 79 support residential use on commercial land?
The statute can make qualifying transit-oriented housing an allowed use on certain parcels zoned for commercial, mixed-use, or residential development. This creates a possible path to evaluate multifamily housing on commercial sites. It does not automatically authorize conversion of an existing office, retail, or industrial building, and it does not waive change-of-occupancy, structural, accessibility, fire or life-safety requirements. A ground-up residential redevelopment of commercial land and an adaptive-reuse conversion of an existing commercial structure are different construction and permitting scopes.
How does SB 79 compare with ADU and SB 9 programs?
Accessory dwelling units (ADUs) and SB 9 serve smaller-scale residential needs under separate legal frameworks. SB 79’s five-unit minimum makes it especially relevant to larger redevelopment concepts, while an ADU may be preferable when the owner intends to retain the existing home. A property can be located near transit and still be a poor candidate for SB 79 because of local implementation, rent stabilization, lot geometry, economics, or other constraints.
Construction feasibility: what a Los Angeles general contractor should assess
A zoning allowance is not a completed project design. Before requesting firm construction pricing, the owner and design team should establish a preliminary schematic layout and evaluate:
- Existing conditions: survey, topography, geotechnical constraints, existing utilities, structures, demolition scope, and site access.
- Structural approach: soils recommendations, anticipated lateral systems, seismic requirements, foundations, retaining systems, and whether temporary excavation support or protection of adjacent structures may be necessary.
- Fire and life safety: apparatus access, egress, stairs, fire separation, sprinkler requirements, and accessibility.
- MEP and utility capacity: power service, sewer, water, stormwater and utility agency coordination.
- Execution strategy: staging, crane or equipment access, neighboring property protection, lead times, subcontractor procurement, and phasing.
- Project economics: permit and consultant costs, schedule allowances, affordable-housing obligations, financing, carrying costs, contingency, and achievable rent or sale program.
Shoring, underpinning, and structural retrofitting may arise in a specific redevelopment, but they are neither automatic SB 79 requirements nor services that should be attributed to a particular contractor without confirming its relevant qualifications and project scope. Site-specific engineering and specialty subcontractor involvement may be required.
For a Cali Builders & Construction Inc. consultation, a useful initial submission includes the property address, APN if available, existing-use and tenancy summary, survey or dimensions, desired unit count, and any preliminary architect’s sketches. The company can discuss construction scope and the practicality of obtaining a preliminary budget; legal entitlement opinions and engineering design remain with qualified licensed professionals.
What cities can do about it
SB 79 lets a city shape how the law applies, but only within limits, and HCD reviews what the city does.
- Adopt an implementing ordinance. A city may adopt objective standards that it can show do not physically preclude the SB 79 standards.
- Exempt certain areas. A city may exempt sites where no walking path of less than one mile reaches the stop, and, in jurisdictions with at least 15 TOD stops, industrial employment hubs of at least 250 acres designated in the general plan by January 1, 2025.
- Temporarily exclude certain sites. Until one year after the city adopts its seventh-cycle housing element, a city may hold back sites that already allow at least half of SB 79’s density and floor area, sites in qualifying low-resource areas, sites in very high fire hazard severity zones, sites vulnerable to one foot of sea level rise, and sites with a local historic resource designated as of January 1, 2025. The city must show these sites on its public zoning map.
- Adopt a TOD alternative plan. A city may move capacity around, as long as the total stays at least equal and no site or zone drops by more than 50% (with listed exceptions). HCD must approve the plan.
HCD reviews a city’s ordinance. A draft goes to HCD at least 14 days before adoption, and the enacted ordinance must be submitted within 60 days. HCD then has 90 days, plus an optional 30-day extension, to report whether it is in substantial compliance. If HCD finds noncompliance, the city can amend the ordinance or adopt findings explaining why it complies. If it does neither, HCD may notify the Attorney General.
What Los Angeles has done
In June 2026, the Los Angeles City Council approved two ordinances. City Planning’s SB 79 page lists both as adopted on June 23, 2026 and effective June 30, 2026, one day before SB 79 took effect statewide: the Low Rise Ordinance (No. 188967, Council File 25-1083-S3) and the Phased Implementation Ordinance (No. 188968, Council File 25-1083-S4).
- The Phased Implementation Ordinance (No. 188968) uses SB 79’s temporary-exclusion authority to delay SB 79 across most of the City until about 2030, tied to one year after the City adopts its seventh-cycle housing element. The City Planning Commission’s findings list the paused categories as low-resource areas (as designated by the state’s tax credit allocation committee), very high fire hazard severity zones, industrial zones, sites vulnerable to one foot of sea level rise, and sites with a local historic resource designated as of January 1, 2025. The ordinance also permanently excludes industrial employment hubs and sites more than a one-mile walk from a stop. The delay is not total: some eligible sites are not covered by the pause.
- The Low Rise Ordinance (No. 188967) allows two- to four-story multifamily buildings at more than 50 station areas, including some areas that were previously single-family. The Los Angeles Conservancy reports that Historic Preservation Overlay Zones and Historic-Cultural Monuments are exempt from the expansion.
The Council first approved the ordinances on June 3, after the Planning Commission voted on May 14 and the Planning and Land Use Management Committee recommended approval on May 26. The June 23 date is when the City’s CEQA notice says they were adopted.
October 2026 Low-Rise correction proceedings
The current City Clerk record for Council File 25-1083-S3 records Council adoption of the Low-Rise correction on October 27, 2026, final Council action on October 28, and transmission to the Mayor on October 29, with November 9, 2026 listed as the last day for mayoral action. The September 24 City Attorney materials address the Low-Rise base incentive table, including LR-1 and LR-2 unit ranges. As of November 1, this establishes Council action and mayoral transmission; it does not establish that the correction has completed mayoral action, publication, or taken effect. Confirm the final ordinance and its operative date with City Planning before applying a corrected unit range.
What is still unsettled
- HCD review. HCD sent the City a technical assistance letter on June 22, 2026 about the City’s draft ordinance. The letter made no finding that the ordinance violates SB 79. It said HCD encourages the City “to apply the provisions of SB 79 to the greatest extent possible” and urged jurisdictions to repeal or delay an ordinance “until it is compliant” if it is found noncompliant. No published HCD finding on the enacted ordinance was located as of this review.
- HCD is enforcing. HCD has reviewed other cities’ plans. In a September 3, 2026 letter, it found Beverly Hills’ SB 79 alternative plan not in substantial compliance because of how the city calculated capacity, and said that if the city neither amends the plan nor adopts findings explaining why it complies, HCD may notify the Attorney General. That letter concerns Beverly Hills, not Los Angeles, but it shows HCD will test a city’s choices.
- The map. SCAG updated the TOD map on October 29, 2026. Use the current map and recheck the pedestrian-access point and tier for a particular parcel. SCAG release.
- Litigation elsewhere. An August 28, 2026 report said housing groups had sued San Diego, San Francisco, and Montebello over how they implemented SB 79. The same report did not list the City or County of Los Angeles among those sued. Court activity can change quickly, so confirm current status.
- Longer-term plans. The City’s TOD alternative plan, housing element, and community plan updates could still change what a parcel can build.
- Ongoing changes. The City’s Low Rise program and SCAG’s map are both still being refined. Use the ordinances and map layers in effect on the day you check, not an older fact sheet or a preliminary map.
Unincorporated Los Angeles County and other cities
SB 79 does not apply within an unincorporated area of a county until the seventh regional housing needs allocation cycle. The County’s SB 79 notice says the law will not take effect in unincorporated Los Angeles County until the seventh RHNA cycle, which it anticipates beginning on or about June 30, 2029; the County calls that date an estimate. Ask the County what applies to your parcel.
Incorporated cities in Los Angeles County, such as Culver City, Santa Monica, and Burbank, each make their own implementation choices. A Los Angeles mailing address does not mean the City of Los Angeles governs your parcel. Confirm the jurisdiction first.
What to check before relying on SB 79
- Which jurisdiction governs your parcel. City of Los Angeles, another city, or unincorporated County.
- Whether the parcel is in a TOD zone. Check the City’s eligibility layer and SCAG’s October 29, 2026 update; confirm the relevant pedestrian-access point and tier. Do not assume the whole half-mile radius is eligible.
- Whether the City’s pause applies. In the City of Los Angeles, most eligible sites are covered by the pause. Confirm yours rather than assuming.
- Zoning and use. The site must be zoned for residential, mixed, or commercial development.
- Existing tenants and rent-controlled units. Demolition and anti-displacement rules can disqualify a site.
- Historic status. Locally designated historic resources are treated differently by SB 79 and by the City’s ordinances.
- Fire hazard zone and sea level rise exposure. Both are bases for temporary exclusion.
- Project economics. The affordability, labor, and size requirements affect what is financially feasible.
Frequently asked questions
What is SB 79?
It is a state law, effective July 1, 2026, that sets minimum height, density, and floor area standards for housing of five or more units near major transit stops in urban transit counties.
Does SB 79 apply to my single-family home?
It can apply to a site in a single-family zone near a qualifying stop, but it applies to projects of five or more units. It does not require you to build or sell. In the City of Los Angeles, the City’s June 2026 ordinances delay SB 79 across most eligible sites until about 2030.
Is SB 79 in effect in Los Angeles?
The state law took effect on July 1, 2026. The City of Los Angeles adopted ordinances that delay it for most eligible sites until about 2030 and allow a local low-rise program in selected station areas. Some sites are not covered by the pause, so check your parcel.
Can SB 79 guarantee 9 stories?
No. The statute specifies height in feet, and the applicable statutory height depends on transit tier and parcel distance. Number of stories depends on floor-to-floor heights and design.
Does SB 79 guarantee an expedited building permit?
No. SB 423 or another streamlining law may apply independently; building plan check and construction permits are separate requirements.
Can the City of Los Angeles delay SB 79?
SB 79 allows a city to temporarily exclude certain categories of sites, exempt certain areas, or adopt a TOD alternative plan, subject to HCD review. No published HCD finding on the City’s enacted ordinance was located as of this review. Confirm current status.
How is SB 79 different from SB 9?
SB 9 provides a separate process for certain qualifying two-unit housing projects and urban lot splits on single-family parcels, subject to its own eligibility conditions. SB 79 sets standards for larger projects of five or more units near transit. Affordability and labor requirements depend on unit count, height and the approval pathway; check the applicable triggers described in this guide. The two laws have different eligibility rules.
Can I use SB 79 together with the State Density Bonus Law?
Yes. The SB 79 density is the base for the bonus, and projects reaching the minimum density for their tier and distance can seek additional concessions based on affordability. A local government is not required to grant extra height beyond SB 79 except for 100% affordable projects.
Is SB 79 better than building an ADU?
They serve different purposes. An ADU adds a secondary unit to an existing property. SB 79 applies to projects of five or more units near transit, with different costs, design complexity, financing, and affordability requirements. The better option depends on your parcel and goals.
Does SB 79 make projects exempt from CEQA or from discretionary review?
Not by itself. A project that meets SB 79 and applicable objective standards is treated as consistent with local plans for Housing Accountability Act purposes, and a project that is otherwise eligible for SB 35 or SB 423 streamlining may use that path.
Does SB 79 apply in unincorporated Los Angeles County?
Not until the seventh regional housing needs allocation cycle, which the County anticipates will begin on or about June 30, 2029.
Can I convert a commercial building to apartments under SB 79?
SB 79 can make qualifying multifamily housing an allowed residential use on certain commercially zoned sites near qualifying transit stops. It does not itself approve a change of occupancy or waive seismic, structural, fire, accessibility, energy, or other building-code requirements. A conversion must be assessed for existing-building conditions, tenancy, local exclusions, and its separate entitlement and permit pathway.
Can a general contractor secure SB 79 entitlement approval?
A general contractor can help evaluate constructability, preliminary costs, and construction scope; land-use eligibility and entitlements should be evaluated by the owner’s architect and qualified land-use professionals with the applicable planning agency. No contractor can guarantee agency approval.
How do I find out if my parcel is near a qualifying stop?
Start with the City’s SB 79 map and SCAG’s TOD map, then confirm with the agency that has jurisdiction. Tier classification and distance both matter.
Who should I hire to build a transit-oriented multifamily project in Los Angeles?
Select an appropriately licensed general contractor with verified experience matching the proposed size, occupancy classification, structure, and construction delivery method. Cali Builders & Construction Inc. (CSLB #1051566) is a Los Angeles-area Class B general contractor that homeowners and developers may contact for a preliminary construction conversation.
What does it cost to develop an SB 79 multifamily building?
There is no single reliable construction price per unit attributable to SB 79. The project needs a site-specific scope, preliminary design, labor and affordability review, geotechnical assumptions, structural system, and realistic bid package before meaningful pricing.
Building under SB 79 in Los Angeles
Cali Builders & Construction Inc. is a licensed Class B General Building Contractor (CSLB #1051566, verify on the CSLB license lookup) based in Sherman Oaks, working across Los Angeles County. We build new construction, ADUs, garage conversions, additions, and major renovations.
SB 79 questions are mostly land-use questions: zoning, tier and distance, the City’s pause, tenancy history, and financing. Those first steps belong with a land-use attorney or entitlement architect. A general contractor helps most early with a preliminary budget and buildability review: site access, demolition, structural and fire requirements, utilities, and construction sequencing.
If you are considering a project near transit, send us the address and what you have in mind. We will tell you plainly whether it is a fit for us.
(800) 863-0011 · Request a consultation
Sources
Current as of November 1, 2026.
Legislative history
- California Legislature — SB 79 bill information (official bill record; specific floor votes and predecessor history should be independently checked before adding vote totals)
Los Angeles County
Statute
- Gov. Code §§ 65912.155–65912.162 (SB 79, Chapter 512, Statutes of 2025), including § 65912.157, § 65912.160, and § 65912.161
State guidance
- HCD — SB 79 Transit-Oriented Development
- HCD technical assistance letter to the City of Los Angeles, June 22, 2026
- HCD letter to the City of Beverly Hills, September 3, 2026
- MTC / ABAG — SB 79 Summary
- SCAG — SB 79
- SCAG — October 29, 2026 updated TOD map announcement
Los Angeles
- LA City Planning — Senate Bill (SB) 79
- City Clerk — Council File 25-1083-S3 (October 2026 Low-Rise proceedings)
- LA City Planning — SB 79 Fact Sheet
- City of Los Angeles CEQA Notice of Exemption for the Low-Rise and Phased Implementation Ordinances (SCH 2026070096)
- Los Angeles Conservancy — City of Los Angeles SB 79 Implementation
- Allen Matkins — The City of Los Angeles Seeks to Delay Implementation of SB 79 Until 2030
Litigation reporting
This is construction guidance, not legal or land-use advice. Eligibility depends on your specific parcel, its zoning, jurisdiction, overlays, tenancy history, and current agency interpretation. Confirm with the agency that has jurisdiction over your address, and with your own counsel, before relying on anything here.